Construction of toe wall



Construction of toe wall

Location: г. Nizhny Novgorod, Nartova st., 4
Customer:LLC METRO CASH AND CARRY
Designer:LLC Sevkaugeoprojectstroy»
Period of construction:August 2013 – October 2013

Problem

Landslide slope along the access road. The situation is complicated by a 25 m high mast installed at the top of the slope and communications passing through the body of the slope (sewer manhole, storm water drainage, power cable).

Purpose

To strengthen the slope using gabion structures, integrating engineering communications into the structure.

Scope of work:

  • The length of the retaining wall – 56 meters
  • The height of the retaining wall – 4.5 meters